WIP Tracking

WIP tracking is the practice of monitoring every piece of work in progress (where it is, who has it and what it is waiting for) so nothing stalls unnoticed between start and delivery.

What is WIP tracking?

WIP stands for work in progress, and WIP tracking is the running record of everything that has started and not yet finished. For each item it shows the current stage, the owner, the next step and the date it needs to get there. In agencies the classic form is the WIP report, or the WIP meeting: a weekly run through every live job, line by line, often with the client on the call.

The term also carries a meaning from lean and kanban methods, where limiting WIP is a goal in itself. Too many things started at once means each one moves slowly. Tracking WIP is how a team sees that it is juggling more than it can finish.

Why it matters

Why WIP tracking matters

Work rarely fails at the stages people are watching. It fails in the gaps: the cut waiting for the client's comments, the asset waiting for legal, the file that was finished but never delivered. WIP tracking makes those waiting states visible, so the question each week is not only what we are doing but what is stuck, and who can unstick it.

It also gives clients confidence. A clear WIP report each week tells a marketing team exactly where their work stands, without a single chasing email.

In practice

How WIP tracking works in practice

  1. 01

    Every live job is listed with the same columns: stage (brief, pre-production, shoot, edit, review, delivery), owner, next action, due date and any blocker. The stages should match how work really moves, and waiting for the client deserves its own status, because it is the most common place work stalls and the one the agency does not control. A board view makes the stages visual; a table makes the weekly review fast.

  2. 02

    The WIP review happens weekly, kept short and run in the same order every time. For each job, the owner gives one line: on track, at risk or blocked, with the action. Blockers get a name and a date. Jobs that have not moved in two weeks get a direct conversation. Work leaves the list only when it is delivered and confirmed, not when it is approved.

At RIOT

WIP tracking at RIOT

A series is WIP tracking in its purest form. The 17 instructor documentaries we made for SoulCycle meant many films in motion, each at its own stage and each with its own next step. Krova, the production software we built, carries every job through bids, schedules and budgets to delivery, because a film is still work in progress until it is where it needs to be.

See the work →

Watch out

What people get wrong about WIP tracking

Tracking status without blockers. A list that says in progress next to everything tells you nothing; the useful information is what each item is waiting on. The second mistake is letting WIP grow unchecked. Starting new work feels productive, but finishing it is what clients pay for. If the list keeps getting longer, the team is starting more than it finishes.

And running the WIP meeting as a recital. If nothing is decided, it is a report that could have been an email.

Questions

People also ask

What does WIP mean in project management?

Work in progress: everything that has started but is not yet finished. WIP tracking follows each item's stage, owner, next step and blockers until it is delivered.

What is a WIP meeting in an agency?

A regular meeting, usually weekly, where the team and often the client review every live job in turn: where it stands, what comes next and what is blocking it. It keeps both sides working from the same picture.

Is WIP the same in finance as in project management?

Related but different. In agency finance, WIP usually means work done but not yet invoiced; in project management it means work started but not yet finished. Both are worth tracking, and both grow when work stalls.

Next to it in the glossary

  1. Time TrackingTime tracking is the practice of recording the hours people spend on their work, so a business can bill accurately, plan capacity and see where its time actually goes.
  2. Waterfall Project ManagementWaterfall project management is a linear method in which each phase of a project (plan, design, build, test, deliver) is finished and signed off before the next one begins.
  3. Week TimesheetA week timesheet is a record of the hours one person worked across a single week, broken down by day, project and type of work.
  4. Work Breakdown Structure (WBS)A work breakdown structure (WBS) is a hierarchical map of everything a project has to deliver, broken into smaller pieces until each one can be estimated, assigned and tracked.
  5. Work ManagementWork management is the overall approach a team uses to plan, organize, track and deliver all of its work, across projects, recurring tasks and everything in between.
  6. Workflow OptimizationWorkflow optimization is the practice of studying how work actually moves through a team, finding where it stalls or gets repeated, and changing the process so it flows faster without losing quality.

Every Project Management and Workflow term →

In the work

Where it shows up

All our creations →

From the journal

Read around it

The journal →

Talking the talk is one thing

We make the work.

RIOT is a creative agency and production studio in New York. Strategy, brand, film, photography, design and the campaigns that carry them, made by one team. A few lines is enough to start: we read every brief the same day.

    Footage